Public Comment Form

Fairfield Energy Center, LLC P0140492

Program

Air Pollution Programs

Notice Type

Draft Permit to Install - Subject to Revision

County / Township

FAIRFIELD

Identification Number(s)

P0140492

Action Date

Oct 8, 2026

Weekly Review Date

Oct 12, 2026


Entity Address

1420 Landcaster-Newark Rd NE Walnut Twp., OH 43046


Notice Info

Notice Info Permit Description: Initial Installation permit-to-install (PTI) for a new natural gas fired electric generating facility utilizing simple cycle turbines. Issue Date: 10/08/2026 Permit Number: P0140492 Permit Type: PSD Facility ID: 0123000448 Facility Location: 1420 Lancaster-Newark Rd., Walnut Twp., OH 43046 Facility Description: Fairfield Energy Center LLC is proposing to construct a new natural gas fired electric generating facility utilizing simple cycle turbines. The Director of the Ohio Environmental Protection Agency, 50 West Town Street, Columbus Ohio has issued a draft air pollution control Prevention of Significant Deterioration (PSD) installation permit for the listed facility. The draft permit is being issued to solicit comments from any interested party for the director to consider prior to making a final decision. The proposed allowable emission rates of PSD pollutants from the facility in tons per year are: Nitrogen Oxides (NOX) 485.8; Carbon Monoxide (CO) 687.1; Volatile Organic Compounds (VOC) 218.3; Particulate Matter (PM) 334.2; PM less than or equal to 10 microns (PM10) 333.4; PM less than or equal to 2.5 microns (PM2.5) 333.3; Sulfur Dioxide (SO2) 86.5; Sulfuric Acid (H2SO4) mist 19.1; Greenhouse Gas/Carbon Dioxide equivalent 7,232,826. Air dispersion modeling was performed to show allowed emission levels will not cause or contribute to an exceedance of any National Ambient Air Quality Standard (NAAQS). The maximum air pollutant concentrations and averaging periods that are expected from this facility are the following in micrograms per cubic meter: 7.30 nitrogen dioxide (NO2) 1-hour, 0.26 NO2 annual; 567.69 CO 1-hour; 312.18 CO 8-hour; 2.97 PM10 24-hour; 1.90 PM2.5 24-hour; 0.14 PM2.5 annual; 2.94 SO2 1-hour; 2.52 SO2 3-hour; 0.87 SO2 24-hour; and 0.05 SO2 annual. Air dispersion modeling was also performed to evaluate potentially toxic compounds and passed all toxic modeling thresholds. All other pollutants were too small to model. Public Comment Info The public comment period will run until November 12, 2026, at 11:59 p.m. Written comments must be received by November 12, 2026. Comments submitted after this date may not be considered. You can submit comments: at the hearing, by mail: Ohio EPA, DAPC, Central Office, 50 West Town St. Suite 700 P.O. Box 1049, Columbus, OH 43216-1049, or online via SMART Comments at https://ohioepa.commentinput.com - Search by entering permit #P0140492 in the "Search Projects" search box. The draft permit is available online at https://ohioepa.commentinput.com - Search by entering permit #P0140492 in the "Search Projects" search box, and physical copies may be inspected at the Central Office (address above). Public Hearing Info The hearing will be held at 6:00 p.m. on November 10, 2026. Date: Tuesday, November 10, 2026, Time: 6:00 p.m., Location: Millersport Elementary Auditorium,11850 Lancaster St., Millersport, OH 43046. The meeting will include a presentation on the permitting process and the PTI, a question-and-answer session, followed by a public hearing. During the hearing, you may provide comments for the official record. Written comments must be received by Nov 12, 2026. Comments submitted after this date may not be considered.


Public Comment Info

The public comment period will run until 11/07/2026 at 11:59 PM.


Permit Desc: Initial permit-to-install for a power generation facility, including combustion turbines, emergency generators, and an emergency firewater pump engine. The permit and complete instructions for requesting information or submitting comments may be obtained at: https://ohioepa.commentinput.com - Search by entering the permit # P0140492 in the "Search Projects" search box.




Public Hearing Info

The hearing will be held at 06:00 PM on 11/10/2026.

Written comments may be submitted here or by mail to

>.


The permit is available to view through Ohio EPA's eDoc system. Launch the form and search for the permit by entering the Entity Name or Permit/Package Number.


Ohio EPA is committed to providing access and inclusion and reasonable accommodation in its services, activities, programs, and employment opportunities in accordance with the Americans with Disabilities Act (ADA) and other applicable laws. To request a reasonable accommodation due to a disability, please contact Naquetta V. Porter, ADA, EEO, and Nondiscrimination Coordinator, 440.975.6801 (call or text) or naquetta.porter@epa.ohio.gov, as soon as possible before the event.




Contact Information

*Indicates Required Fields

Submitted by Value

First Name

Last Name

Address

City

State

ZIP

Email *

Consent to Mailing List

Your Comment


Enter comments here.

Click upload below to attach an optional document, exhibit or letter.


*Uploading a file is optional*

You may attach up to five 20 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx, xlsx, xls. If you experience technical difficulties submitting your comment please contact the person listed at the bottom of this page.


Thank you for subscribing to the Fairfield Energy Center, LLC P0140492 mailing list.