RULES: DSW No Change Rules 2026 (OAC Chs 3745-1, -2, -11) - Early Stakeholder Outreach
This rulemaking is being undertaken to complete the required five-year rule review for these nine rules, for which the agency plans no changes at this time:
· 3745-1-09 Scioto river drainage basin.
· 3745-1-12 Sandusky river drainage basin.
· 3745-1-19 Huron river drainage basin.
· 3745-1-23 Portage river drainage basin.
· 3745-1-32 Ohio river standards.
· 3745-2-12 Total maximum daily loads.
· 3745-11-01 Definitions.
· 3745-11-02 Standard and special connection bans.
This rulemaking is being undertaken to complete the required five-year rule review for these nine rules, for which the agency plans no changes at this time:
· 3745-1-09 Scioto river drainage basin.
· 3745-1-12 Sandusky river drainage basin.
· 3745-1-19 Huron river drainage basin.
· 3745-1-23 Portage river drainage basin.
· 3745-1-32 Ohio river standards.
· 3745-2-12 Total maximum daily loads.
· 3745-11-01 Definitions.
· 3745-11-02 Standard and special connection bans.
· 3745-11-03 Connection ban variances.
For more information on this rulemaking, please see the Fact Sheet available here: https://epa.ohio.gov/divisions-and-offices/surface-water/regulations/early-stakeholder
If you have questions, contact:
Mariah Hood at Mariah.Hood@epa.ohio.gov or 614.644.2865 (Ch. 3745-1)
Shante Eisele at Shante.Eisele@epa.ohio.gov or 614.644.2144 (Ch. 3745-2)
Tony Nosko at Anthony.Nosko@epa.ohio.gov or 614.644.1987 (Ch. 3745-11)
Contact Information
*Indicates Required Fields